The final few decals are in place and the entire machine is ready for flat clearcoat. After that will be the final assembly process. Today I offered up the completed skis to the airplane to ensure that everything aligns correctly.

Fiat CR.42 Group Build
The tailwheel fairing has to be trimmed away to fit the Swedish tail ski and I overlooked that little detail during the build. I was a bit concerned to have to take the Dremel tool and drum sander to the fairing at this late stage, but nothing fell off during the trimming.

Fiat CR.42 Group Build